ADR-0016: Staged Development

Note

Coding starts in stages, not after every design row is stable. Each milestone of Development Readiness starts when the notes it needs have reached review; the rows it does not need are deferred to the milestone that does. M0 starts once the package layout and the testing strategy are written. Accepted by the maintainer in chat on 2026-11-02 ("agree").

Context

Vault Reference > Design completeness checklist says coding starts only when every row is stable or deferred by an accepted ADR. On 2026-11-02 the vision is stable, the runtime, surface and integration specs are written, and tess_dl and tre 0.5.10 are available, but Delivery, most of Quality, the module list and the token values are not written. The maintainer's stance is that TEL, tre, TDL and the shell are developed together and the design stays open to change (Roadmap > Working Mode: Fluid Dependencies).

Options

Option A — Staged Start (Chosen)

Defer the rows that a milestone does not need to the milestone that does.

  • For: the design is tested by running code early; a wrong design is found at M1, not at the end; it matches the fluid stance.
  • Against: some design work may be revised after code exists.

Option B — Wait for Every Row to Be Stable

  • Against: holds the skeleton for work it does not need (delivery, security, token values).

Decision

Accepted 2026-11-02 by the maintainer in chat ("agree"): Option A.

Row Deferred to Reason
Integration M5 The live tests need the running shell; the specs exist
Quality: accessibility, security model, crash recovery M2 (accessibility, security), M6 (crash recovery) The testing strategy is written before M0; the rest follow code
Delivery M6 Needs a working shell
Design system: token values, iconography M1 and M2 M1 needs the building blocks, not the values
Python API for Python-built shells After M2 Needs the module contract working
Surfaces: Popup M3 Not needed before the Bar works

Note

Amendment 2026-11-08 (maintainer): milestone numbers The milestone plan changed (Development Readiness): M4 is the widgets, M5 the services and desktop integration (one milestone in smaller parts), M6 focus and keyboard, and M7 the release. The rows above that were deferred to M6 (crash recovery, delivery) are now deferred to M7. The decision itself, Option A, is unchanged.

Not deferred: Vision, Architecture (the binder is accepted), Runtime (needed at M0), Engine requests. A milestone starts when its "Needs" notes in Development Readiness are at review. The first milestone, M0, starts when Shell Package Layout and Testing Strategy are written.

Consequences

  • Vault Reference > The projects no longer says design only: it says design continues alongside staged development. The agent still writes code only inside the milestone in progress, and keeps the vault as the design record.
  • Each milestone ends with an update to the notes it touched, and a list of design changes it forced.
  • A design change found by code is a dated amendment or a new ADR, never silent (Roadmap > Working Mode: Fluid Dependencies).
  • Code lives in the tess-shell repository, under src/tess_shell/ and tests/, with the docs export kept in docs/ (Shell Package Layout).